Mechanic’s Liens in Arizona*
On most non-residential (where a resident does not live in the home)
construction projects, most anyone that provides services or materials may file a
mechanic’s lien for the amount owed. There are set steps that need to be strictly
followed or the right is lost.
Arizona law requires that every person (except for a person performing
actual labor for wages) who furnishes labor, professional services, materials,
machinery, fixtures or tools to a construction project, within 20 days of
commencing work, provide written notice, called a preliminary twenty-day notice,
of their statutory lien rights to the home owner, constructions lender, original
contractor, and the person with whom the claimant has contracted.
The amount of time a claimant has to record the actual mechanic’s lien
depends on whether the owner files a notice of completion of the project. Filing a
notice of completion is optional for the owner of the property, but if it is filed, the
period of time for which the claimant has to file a lien is 60 days from the
recording of the notice of completion; otherwise, it is 120 days from the
completion to file the lien.
Completion is defined, if a governmental permit final inspection is required,
as the earliest of the following events: 1) 30 days after final inspection and written
final acceptance by the governmental body that issued the permit, or 2) cessation
of labor for 60 days. In the event no building permit is issued or if the
governmental body that issued the permit does not issue a final inspection and
acceptance, then the completion is the last day on which labor, materials, fixtures,
or tools were furnished to the property.
Once a lien is recorded, the lienholder must judicially foreclose on the lien
within 6 months of recording or it will no longer exist. An owner may discharge
the lien by posting a bond 1.5 times the amount claimed and the lien holder then
must proceed against the bond and obtain a judgment.

WHO MAY FILE A MECHANIC’S LIEN IN ARIZONA AND FOR
WHAT?
In a commercial project, most anyone that provides services or materials
may file a lien for the amount owed. In a residential project, the entity or
individual must have a contract directly with the owner.
Any contractor, whether general or subcontractor, must have a valid license
issued by the Arizona Registrar of Contractors in order to have lien rights against
an owner’s property.
The lien is given a 20% variance over the stated amount, but must be
amended and served if the amount owed increases over that amount.
Contractor licensing is required for “any business which contracts or offers
to contract to build, alter, repair, add to, subtract from, improve, move, wreck or
demolish any building…, or to do any part of the work” detailed above.
2

Exceptions to the licensing requirement include a small “handyman
exception” for small dollar amounts that are not part of a larger project. There is
also an exception for manufacturer-installers that install their own product.

*This is provided for informational purposes only and should not be
considered as legal advice nor does it create an attorney client relationship. If
you have a need or interest concerning Mechanic’s Liens, please consult a
qualified attorney.

Download PDF
Email
Report

Note close

Firefox stands out on the PDF WordPress plugin for Mac OS X for viewing PDF documents inside your browser.

We are able to also demonstrate Legal Updates while using Google Viewer however, you will have to be logged into Google Docs to see them.

Please choose among the above to proceed!

LOADING PDF: Should there be any problems, click the link to download the file.

Leave a Reply